Improving fire safety design with coupled hybrid modelling
Contents |
[edit] Introduction
A new computer model can provide added insights into fire risks in complex buildings, and help engineers to develop robust fire safety designs. This coupled hybrid modelling has been investigated by Benjamin Ralph as part of a BRE Trust supported PhD studentship at the University of Edinburgh.
Fire engineers commonly use computational fluid dynamics (CFD)-based fire modelling to develop and test the designs of complex buildings. However, as these models are very complicated and this type of simulation takes an impractically long time to run, engineers typically reduce the size of the model to shorten the time needed.
The problem is that a simplified model may not be able to account for the entire building. That means that the ways in which fire and smoke might spread throughout the whole building cannot be fully determined, nor can the effect on the growth and spread of fire and smoke of parts of the building far from the fire. This can put limits on the ability of engineers to develop robust fire safety solutions.
One way of addressing this limitation is the use of ‘coupled hybrid modelling’. This combines the originally used model (which takes a long time to run) and another model (which takes a much shorter time) together. Fire engineers can thereby increase the model size to include more or all of a building, but still carry out a simulation in a reasonable length of time.
[edit] The research
[edit] New model and experimental test rig
A literature review of existing coupled hybrid models identified a lack of collaborative working and the use of proprietary software. Therefore, a coupled hybrid model has been developed, based on the open-source and widely used fire model, Fire Dynamics Simulator (FDS).
A new computer model must be compared with real experiments to confirm that it can represent the real world within reasonable limits. Applicable experimental data were not found during an extensive literature search and discussions with applicable bodies. Therefore, to provide these data, a new experimental rig was specifically designed and built.
[edit] Ventilation issue revealed
Data from the new rig were first used to examine potential holes in the current typical fire safety design model for complex buildings. This analysis showed that there are phenomena related to the two-way coupling of a fire and a shared ventilation system, which may not be captured by commonly used simple engineering methods – or addressed in current design guidance documents.
The new experimental data was then compared with the predictions of the coupled hybrid computer model, and the qualitative and quantitative differences highlighted. The computer model was found to predict fire hazards within the experimental set-up effectively, providing key information needed by future model users to ensure that their analysis is robust.
The original insights into how a total building system and a fire interacts, and the newly developed coupled hybrid model, can be used together by fire engineers. This will help them to deliver design solutions with more deeply understood fire life safety risks for complex buildings that incorporate mechanical ventilation systems.
[edit] About this article
This article was written by the BRE Group and previously appeared on its website in January 2020. It can be accessed HERE.
Other articles by BRE Group on Designing Buildings Wiki can be accessed HERE.
[edit] Related articles on Designing Buildings Wiki
- Approved document B.
- Combustibility.
- Dry riser.
- Emergency services.
- Evacuating vulnerable and dependent people from buildings in an emergency FB 52.
- Fire damper.
- Fire detection and alarm system.
- Fire door.
- Fire protection engineering.
- Fire resistance.
- Fire safety design.
- Fire spread.
- Fire stopping.
- Flame technology.
- Ionisation smoke alarm.
- Joint fire code.
- Optical smoke alarm.
- Protected escape route.
- Protected lobby.
- Managing risks in existing buildings: An overview of UK risk-based legislation for commercial and industrial premises (FB 86).
- The causes of false fire alarms in buildings.
Featured articles and news
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.
Access, history and Ty unnos.
The world’s first publicly funded civic park.
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building 2024 judges choice winner
Once Upon a Pass by Liam Man.
CIOB Art of Building 2024 public choice winner
Fresco School by Roman Robroek.
HE expands finance alliance to boost SME house building
Project follows on from Habiko public-private place making pension partnership for affordable housing delivery.
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.